This policy is specially designed to give financial protection to the Civil Engineering Contractors in the event of an accident to the civil engineering works under construction.
This policy is specially designed to give financial protection to the Civil Engineering Contractors in the event of an accident to the civil engineering works under construction.
CAR insurance is All Risk insurance in simple language the policy covers loss or damage to civil work during course of construction by every CAUSE WHICH ARE NOT EXCLUDED UNDER THE POLICY.
The sum insured under section II should represent the per accident limit (the maximum legal liability that may fall on the insured as a result of an accident in the insured’s site). The limit per policy period should be fixed taking into account the maximum number of such accidents which can reasonably be expected to occur.
Period of insurance should be equivalent to the period of contract, commencing from the date of unloading of the first batch of material at the site of construction and expiring on the date of handing over of the contract work to the principal.
In case of delay in completion of work, policy can be extended by paying additional premium depends upon extension period.
Excess:5% of claim amount subject to minimum ——–depends upon nature of work for normal and AOG/Major Perils/ Collapse claims.